480-361-3667

Retrofit Tucson Water Plant

System automation control for water distribution and provided general treatment for water plant. I updated existing conceptual designs and engineering for Pump and Treatment Systems at the Silverbell Landfill Water Quality Assurance Revolving Fund. (WQHRF) The upgraded underground pump-and-treat system was increased from its original design of 200 gallons per minute to 400 and 600 gallons per minute.

Retrofit Tucson Water Plant

Our extensive experience and strong company emphasis on creative problem solving enables our company to accept design challenges across multiple fields.